Namakaran Fakher Engineering Co. logo
Namakaran Fakher Engineering Co.
Aban 1405 (Oct–Nov 2026) — Tehran

Exposed concrete price in Tehran — approximate Aban 1405 (Oct–Nov 2026) rates

Tehran is the main exposed concrete tile market and prices are fairly transparent: standard 40×100 and 50×100 tiles about 1.3 to 1.7 million Toman per m² and special patterns up to 3 million. Complete installation with substructure and installation comes to about 4.8 to 6.2 million per m² (without overhead).

All prices are approximate, based on the company's supply rates (Namakaran Fakher Engineering Co.) and the Aban 1405 (Oct–Nov 2026) survey, with Tehran as the base; all rates exclude VAT. Daily material prices change and a firm figure is issued only with a detailed estimate for your project — all numbers must be re-confirmed at contract time.

Before ordering, make sure to see the tile sample up close; the texture and color of exposed concrete do not come across well in photos. We show executed examples and buy the tile with a same-day factory quote.

Exposed concrete

Aban 1405 (Oct–Nov 2026)

Material price based on the Aban 1405 survey of exposed-concrete tile sellers; full installation depends on the design and substructure density.

ItemUnitApprox. range (Toman)
Exposed concrete tile (40×100 and 50×100 — material)m²1,300,000 to 1,700,000
Standard / reinforced facade panel (material)m²2,000,000 to 4,500,000
Patterned tile / special shapesm²1,700,000 to 3,000,000
Installation labor (substructure + installation)m²2,500,000 to 3,500,000
Complete exposed concrete installation (with 20% overhead)m²7,400,000 to 10,400,000

Steel and facade substructure

Aban 1405 (Oct–Nov 2026)

Priced per kilogram. Substructure weight ranges from roughly 6 to 10 kg per m² of facade depending on the system.

ItemUnitApprox. range (Toman)
Facade substructure — box profile, profiles and 2 mm sheetkg165,000
15×15 perforated plate (5 or 6 mm)pc400,000 to 500,000
Jenny anchorpc280,000 to 350,000

Engineering and overhead

Aban 1405 (Oct–Nov 2026)

This share is always in the final total. Wherever you do not see it, something has been cut from the quality of the work.

ItemUnitApprox. range (Toman)
Shop drawings and execution drawingsm² of facade250,000 to 600,000
Execution supervision and site managementm² of facade200,000 to 500,000
Profit, overhead and company ancillary costs% of total20

What pushes the price up or down?

Tile surface patternBrand and dimensionsSubstructure densityHeight and accessFinal jointing

Common questions about pricing

An exact estimate for your project in Tehran

Send your drawings and project specifications; we provide a detailed, free estimate — with a full breakdown of transport and crew dispatch for other cities.

Direct WhatsApp09396273115
Resume