Exposed concrete price in Tehran — approximate Aban 1405 (Oct–Nov 2026) rates
Tehran is the main exposed concrete tile market and prices are fairly transparent: standard 40×100 and 50×100 tiles about 1.3 to 1.7 million Toman per m² and special patterns up to 3 million. Complete installation with substructure and installation comes to about 4.8 to 6.2 million per m² (without overhead).
All prices are approximate, based on the company's supply rates (Namakaran Fakher Engineering Co.) and the Aban 1405 (Oct–Nov 2026) survey, with Tehran as the base; all rates exclude VAT. Daily material prices change and a firm figure is issued only with a detailed estimate for your project — all numbers must be re-confirmed at contract time.
Before ordering, make sure to see the tile sample up close; the texture and color of exposed concrete do not come across well in photos. We show executed examples and buy the tile with a same-day factory quote.
Exposed concrete
Aban 1405 (Oct–Nov 2026)Material price based on the Aban 1405 survey of exposed-concrete tile sellers; full installation depends on the design and substructure density.
| Item | Unit | Approx. range (Toman) |
|---|---|---|
| Exposed concrete tile (40×100 and 50×100 — material) | m² | 1,300,000 to 1,700,000 |
| Standard / reinforced facade panel (material) | m² | 2,000,000 to 4,500,000 |
| Patterned tile / special shapes | m² | 1,700,000 to 3,000,000 |
| Installation labor (substructure + installation) | m² | 2,500,000 to 3,500,000 |
| Complete exposed concrete installation (with 20% overhead) | m² | 7,400,000 to 10,400,000 |
Steel and facade substructure
Aban 1405 (Oct–Nov 2026)Priced per kilogram. Substructure weight ranges from roughly 6 to 10 kg per m² of facade depending on the system.
| Item | Unit | Approx. range (Toman) |
|---|---|---|
| Facade substructure — box profile, profiles and 2 mm sheet | kg | 165,000 |
| 15×15 perforated plate (5 or 6 mm) | pc | 400,000 to 500,000 |
| Jenny anchor | pc | 280,000 to 350,000 |
Engineering and overhead
Aban 1405 (Oct–Nov 2026)This share is always in the final total. Wherever you do not see it, something has been cut from the quality of the work.
| Item | Unit | Approx. range (Toman) |
|---|---|---|
| Shop drawings and execution drawings | m² of facade | 250,000 to 600,000 |
| Execution supervision and site management | m² of facade | 200,000 to 500,000 |
| Profit, overhead and company ancillary costs | % of total | 20 |
What pushes the price up or down?
Common questions about pricing
An exact estimate for your project in Tehran
Send your drawings and project specifications; we provide a detailed, free estimate — with a full breakdown of transport and crew dispatch for other cities.