Stretch metal price in Tehran — approximate Aban 1405 (Oct–Nov 2026) rates
Tehran is the main stretch metal market; sheets are cut and expanded in the factories around Tehran and transport is short. In Aban 1405, expanded sheet is about 700 thousand to 1.2 million Toman per m², double-coat oven paint is 1.5 million and substructure and installation start from 2.5 million Toman.
All prices are approximate, based on the company's supply rates (Namakaran Fakher Engineering Co.) and the Aban 1405 (Oct–Nov 2026) survey, with Tehran as the base; all rates exclude VAT. Daily material prices change and a firm figure is issued only with a detailed estimate for your project — all numbers must be re-confirmed at contract time.
For stretch metal ceilings (restaurants, cafés, lobbies) the substructure is usually lighter than an exterior facade and access costs less; for facades at height, access costs (lift) are quoted separately in the estimate. Send the pattern and area and we will propose the right mesh opening — the right opening affects both looks and price.
Punch metal, stretch metal and CNC
Aban 1405 (Oct–Nov 2026)Fabrication and paint labor is at the company's rate; the steel sheet itself (e.g., stretch-metal sheet with a known weight) is priced by kilogram from the steel table.
| Item | Unit | Approx. range (Toman) |
|---|---|---|
| Punch and CNC fabrication labor | m² | 2,000,000 to 4,000,000 |
| Double-coat oven paint (both sides) | m² | 1,500,000 |
| Metal substructure + fabrication and installation | m² | 2,500,000 to 3,000,000 |
Steel and facade substructure
Aban 1405 (Oct–Nov 2026)Priced per kilogram. Substructure weight ranges from roughly 6 to 10 kg per m² of facade depending on the system.
| Item | Unit | Approx. range (Toman) |
|---|---|---|
| Facade substructure — box profile, profiles and 2 mm sheet | kg | 165,000 |
| 15×15 perforated plate (5 or 6 mm) | pc | 400,000 to 500,000 |
| Jenny anchor | pc | 280,000 to 350,000 |
Engineering and overhead
Aban 1405 (Oct–Nov 2026)This share is always in the final total. Wherever you do not see it, something has been cut from the quality of the work.
| Item | Unit | Approx. range (Toman) |
|---|---|---|
| Shop drawings and execution drawings | m² of facade | 250,000 to 600,000 |
| Execution supervision and site management | m² of facade | 200,000 to 500,000 |
| Profit, overhead and company ancillary costs | % of total | 20 |
What pushes the price up or down?
Common questions about pricing
An exact estimate for your project in Tehran
Send your drawings and project specifications; we provide a detailed, free estimate — with a full breakdown of transport and crew dispatch for other cities.