Namakaran Fakher Engineering Co. logo
Namakaran Fakher Engineering Co.
Aban 1405 (Oct–Nov 2026) — Tehran

CNC facade price in Tehran — approximate Aban 1405 (Oct–Nov 2026) rates

Tehran has the largest fleet of CNC and punch machines, which creates competitive pricing. In Aban 1405, punch and CNC fabrication labor runs from 2 to 4 million Toman per m² (depending on pattern and paint), double-coat oven paint is 1.5 million and substructure and installation start from 2.5 million.

All prices are approximate, based on the company's supply rates (Namakaran Fakher Engineering Co.) and the Aban 1405 (Oct–Nov 2026) survey, with Tehran as the base; all rates exclude VAT. Daily material prices change and a firm figure is issued only with a detailed estimate for your project — all numbers must be re-confirmed at contract time.

CNC ceiling work (lobbies, restaurants, vitrines) usually has smaller areas and more precise patterns; it is estimated separately from facades. Send the pattern (even a photo) and we will estimate the machine hours and give you the breakdown.

Punch metal, stretch metal and CNC

Aban 1405 (Oct–Nov 2026)

Fabrication and paint labor is at the company's rate; the steel sheet itself (e.g., stretch-metal sheet with a known weight) is priced by kilogram from the steel table.

ItemUnitApprox. range (Toman)
Punch and CNC fabrication laborm²2,000,000 to 4,000,000
Double-coat oven paint (both sides)m²1,500,000
Metal substructure + fabrication and installationm²2,500,000 to 3,000,000

Steel and facade substructure

Aban 1405 (Oct–Nov 2026)

Priced per kilogram. Substructure weight ranges from roughly 6 to 10 kg per m² of facade depending on the system.

ItemUnitApprox. range (Toman)
Facade substructure — box profile, profiles and 2 mm sheetkg165,000
15×15 perforated plate (5 or 6 mm)pc400,000 to 500,000
Jenny anchorpc280,000 to 350,000

Engineering and overhead

Aban 1405 (Oct–Nov 2026)

This share is always in the final total. Wherever you do not see it, something has been cut from the quality of the work.

ItemUnitApprox. range (Toman)
Shop drawings and execution drawingsm² of facade250,000 to 600,000
Execution supervision and site managementm² of facade200,000 to 500,000
Profit, overhead and company ancillary costs% of total20

What pushes the price up or down?

Pattern density and machine hoursSingle-sided or double-sidedSheet thickness and oven paintHeight and accessOrder quantity

Common questions about pricing

An exact estimate for your project in Tehran

Send your drawings and project specifications; we provide a detailed, free estimate — with a full breakdown of transport and crew dispatch for other cities.

Direct WhatsApp09396273115
Resume