Cement board price in Tehran — approximate Aban 1405 (Oct–Nov 2026) rates
Tehran has the widest range of cement board brands (Iranian, Thai, DP and more), which lets you buy the right sheet with the right budget. In Aban 1405, flat sheet runs from about 700 thousand Toman (6 mm) to 1.7 million (12 mm) per m², and dry installation with substructure starts from 2.5 million Toman.
All prices are approximate, based on the company's supply rates (Namakaran Fakher Engineering Co.) and the Aban 1405 (Oct–Nov 2026) survey, with Tehran as the base; all rates exclude VAT. Daily material prices change and a firm figure is issued only with a detailed estimate for your project — all numbers must be re-confirmed at contract time.
In Tehran the issue is execution quality, not finding the sheet: joint waterproofing and correct screw spacing are exactly where a healthy facade and a leaking one differ. We write the execution detail before starting and buy the sheet with a same-day quote from the dealer.
Cement board (fiber cement)
Aban 1405 (Oct–Nov 2026)Material price per m² — depends on the brand (Iranian, Thai, DP), thickness and pattern. Aban 1405 market survey; for your project we request a same-day quote.
| Item | Unit | Approx. range (Toman) |
|---|---|---|
| Flat sheet 6 mm | m² | 700,000 to 1,000,000 |
| Flat sheet 8 mm | m² | 900,000 to 1,300,000 |
| Flat sheet 10 mm | m² | 1,100,000 to 1,500,000 |
| Flat sheet 12 mm | m² | 1,200,000 to 1,700,000 |
| Wood-grain / siding pattern (8 mm) | m² | 1,100,000 to 1,600,000 |
| Dry installation labor for cement board (substructure + installation) | m² | 2,500,000 to 3,000,000 |
Steel and facade substructure
Aban 1405 (Oct–Nov 2026)Priced per kilogram. Substructure weight ranges from roughly 6 to 10 kg per m² of facade depending on the system.
| Item | Unit | Approx. range (Toman) |
|---|---|---|
| Facade substructure — box profile, profiles and 2 mm sheet | kg | 165,000 |
| 15×15 perforated plate (5 or 6 mm) | pc | 400,000 to 500,000 |
| Jenny anchor | pc | 280,000 to 350,000 |
Engineering and overhead
Aban 1405 (Oct–Nov 2026)This share is always in the final total. Wherever you do not see it, something has been cut from the quality of the work.
| Item | Unit | Approx. range (Toman) |
|---|---|---|
| Shop drawings and execution drawings | m² of facade | 250,000 to 600,000 |
| Execution supervision and site management | m² of facade | 200,000 to 500,000 |
| Profit, overhead and company ancillary costs | % of total | 20 |
What pushes the price up or down?
Common questions about pricing
An exact estimate for your project in Tehran
Send your drawings and project specifications; we provide a detailed, free estimate — with a full breakdown of transport and crew dispatch for other cities.