Composite facade price in Tehran — Aban 1405 (Oct–Nov 2026)
Tehran is both the largest composite market and the price base. In Aban 1405 the sheet runs from about 450 thousand Toman (economy) to 4.5 million (premium), and complete installation with substructure is about 3 to 6.5 million Toman per m².
All prices are approximate, based on the company's supply rates (Namakaran Fakher Engineering Co.) and the Aban 1405 (Oct–Nov 2026) survey, with Tehran as the base; all rates exclude VAT. Daily material prices change and a firm figure is issued only with a detailed estimate for your project — all numbers must be re-confirmed at contract time.
Tehran's volume of work means there are many composite installation crews — with varying quality. Before comparing prices, check the substructure (about 6 to 7 kg of profile per m²) and the sheet type; the price difference usually lives exactly in these two.
Aluminum composite panel
Aban 1405 (Oct–Nov 2026)The main difference between brands is the aluminum skin thickness (0.2 to 0.5 mm) and the PVDF coating.
| Item | Unit | Approx. range (Toman) |
|---|---|---|
| Economy / signage sheet | m² | 450,000 to 900,000 |
| Standard sheet (0.30 mm skin) | m² | 3,500,000 |
| Premium sheet (0.5 mm skin, PVDF) | m² | 2,500,000 to 4,500,000 |
| Complete composite installation with substructure | m² | 9,000,000 to 15,500,000 |
Steel and facade substructure
Aban 1405 (Oct–Nov 2026)Priced per kilogram. Substructure weight ranges from roughly 6 to 10 kg per m² of facade depending on the system.
| Item | Unit | Approx. range (Toman) |
|---|---|---|
| Facade substructure — box profile, profiles and 2 mm sheet | kg | 165,000 |
| 15×15 perforated plate (5 or 6 mm) | pc | 400,000 to 500,000 |
| Jenny anchor | pc | 280,000 to 350,000 |
Engineering and overhead
Aban 1405 (Oct–Nov 2026)This share is always in the final total. Wherever you do not see it, something has been cut from the quality of the work.
| Item | Unit | Approx. range (Toman) |
|---|---|---|
| Shop drawings and execution drawings | m² of facade | 250,000 to 600,000 |
| Execution supervision and site management | m² of facade | 200,000 to 500,000 |
| Profit, overhead and company ancillary costs | % of total | 20 |
What pushes the price up or down?
Common questions about pricing
An exact estimate for your project in Tehran
Send your drawings and project specifications; we provide a detailed, free estimate — with a full breakdown of transport and crew dispatch for other cities.